The Estimation of Downstream Piping of a Dam (Case Study: Dewerige Dam- Iraq)

Authors

  • zahraa Resul petroleum engineering / Misan university
  • Riaed S. Jassem

DOI:

https://doi.org/10.61263/mjes.v1i2.20

Keywords:

Keywords: SEEP/W; piping; downstream; weir; Dewerige dam

Abstract

The study deals with the geotechnical and hydrological problems in Dewerige dam. It's a new hydraulic structure constructed on Dewerige river in the southeast of Misan governorate, which represents a multipurpose. The dam is used for flooding control, water storage for irrigation, and recharges groundwater. The current study aimed to study seepage quantity under a small concrete dam (weir). SEEP/W software has been used to solve a simulation model at steady stat to evaluate piping downstream (Toe) in saturated soil. Uplift pressure, seepage velocity, hydraulic gradient, and piping safety factor were calculated in SEEP/W. The model results explain that the piping safety factor was (1.7), Therefore, the dam is relatively safe against piping problems in flooding conditions.

Downloads

Published

2022-12-30

How to Cite

Resul, zahraa, & Jassem, R. S. . (2022). The Estimation of Downstream Piping of a Dam (Case Study: Dewerige Dam- Iraq). Misan Journal of Engineering Sciences, 1(2), 50–55. https://doi.org/10.61263/mjes.v1i2.20